Vol 2 Chapter 562: The construction of the nuclear fusion power station has officially begun!
-
I Have a Little Black Hole
- Stealth Scorpion
- 1272 characters
- 2021-03-03 01:31:49
Not only the country thinks this way, even energy companies have not given up on the nuclear fusion reactor technology of several other routes. The people in the laboratory have also conducted preliminary research and discussion on those technologies, but at this stage they are still using their hands. The technology provided by this boss is mainly.
A thousand birds in the forest is not as good as a bird in hand. There is already a commercially available nuclear fusion reactor technology. Of course, we must focus on this technology first, and tap the potential to continue in-depth research and development. The Infinite Gravity Group will do it now. Things.
As for the technologies of other routes, just keep paying attention and discuss, so that your knowledge reserves are not lagging behind. Of course, some basic research and design work can also be done simultaneously, but it should not be the mainstream.
And the country here has passed the company's application for the construction of the experimental reactor of the nuclear fusion reactor for the first time, so of course the energy company must start construction immediately!
It is said that it is an experimental reactor. In fact, the scale of the nuclear fusion reactor that Lei Tiantang arranged for the energy company to build is in accordance with the requirements of the demonstration reactor. The requirement is that after completion, it can be directly connected to the power supply after debugging.
After all, even if the real experimental reactor has been built, the nuclear fusion reactor at the seabed base is the real experimental reactor. It has been running smoothly for several months. Up to now, all the performance indicators are in full compliance with the design standards. With this confidence, it would be a waste of time to repeat the construction of a small-scale nuclear fusion experimental reactor.
Therefore, even if the application is for the construction of an experimental reactor, the design scale and the design of supporting facilities are designed according to the scale of a formal nuclear fusion reactor power station.
Although the experts of the audit team and the country know this, everyone has not blocked it. Since Infinite Gravity Group dared to do this, it must be very confident in its own technology.
And doing so is also good for the country. If you build the model reactor as long as there are no problems, it can help the country save at least half a year of technical observation time. This is not only good for the Infinite Gravity Group, but also for everyone in the country. This kind of preparation is also beneficial.
For the country, if it can be determined half a year in advance that the technology of this nuclear fusion reactor power station is mature and usable, then the relevant policies and market adjustments can take more than half a year of preparation time, because it has not been confirmed that the technology is indeed When mature and usable, it is impossible to do too much action, otherwise if the experimental technique fails, those adjustments will become troublesome.
Lei Tiantang directly put the energy company on the demonstration reactor. On the one hand, he has confidence in the nuclear fusion reactor technology developed by him and Kuafu. On the other hand, he also considered the company's interests.
We must know that the companies and factories that Infinite Gravity Group has completed and put into production and the projects under construction are all energy-intensive consumers. Even with the scale of Infinite Gravity Group, everyone is muttering when paying electricity bills every month!
You must know that the company’s electricity is charged according to the standards of industrial electricity. The price of each kilowatt-hour is between 80 yuan and 1.5 yuan. In the three months at the end of last year, the average The monthly electricity bill of Infinite Gravity Group is as high as 200 million yuan, which is a little more!
In other words, the electricity bill for three months will have to be 100 million U.S. dollars. Such cost expenditures are acceptable. However, the company uses so much electricity every month, and the pressure on the government is not small. Electricity load has brought a lot of burden to the circuit and power allocation.
In order to ensure the electricity demand of Infinite Gravity Group, the Hefei Municipal Government also specifically asked the power company to pull special lines for them and install several high-power transformers.
However, as the scale of the Infinite Gravity Group becomes larger and larger, the government's preparations will soon fail to keep up. Let alone other things, let's talk about the Interstellar Age Research Institute under high-speed construction!
After the super-large hadron collider was built, the electricity needed to start an experiment and perform an experiment is more than 10 million kWh, and it still consumes electricity in a short period of time. This requires more stringent power grids!
There are also the rapid expansion of supercomputer units, the closed ecological farm laboratory under construction, etc., which are all energy-intensive consumers. There are also some other construction projects. When these things are online this year, Infinite Gravity Group will only Monthly electricity consumption can reach more than 300 million kWh or even higher!
The electricity bill is paid by Infinite Gravity Group, but the grid cannot afford it! You know, even during the hottest last summer, the electricity consumption in Hefei City was only nearly 4 billion kWh in a month!
Now your company’s monthly electricity consumption will take up about one-tenth of the electricity consumption of a city, and the power grid will definitely not be able to stand it during peak electricity consumption.
So if the company builds a power station for itself~EbookFREE.me~ and then pulls a special line to supply power to the company, then you can use it as you want!
Based on the scale of application for the nuclear fusion reactor power station built this time, even if the Infinite Gravity Group can do it again, its electricity consumption is only a fraction of the power generation of the reactor, and the remaining points can be used at a very favorable price. If you sell it to a power company, you won’t lose money even if you sell 1 cent to the Infinite Gravity Group. After all, this reactor is mainly to ensure the company’s later electricity safety, and money is incidental.
Such cheap electricity can at least benefit the entire Hefei City and surrounding cities, and make the city’s economic development faster. Of course, the government can see the benefits here, and the country is also ready to The experimental cities for policy adjustments are placed in Hefei City.
The construction land for the nuclear fusion reactor has been prepared long ago, and the initial work such as the leveling of the land has been prepared.
Although the safety of nuclear fusion reactor technology is much higher than that of nuclear fission reactors, there are still risks. Therefore, the reactor construction location this time is not far from the company's rocket engine static test base, and it is also in that small mountainous area.
The geological structure here is stable, and there has never been a major earthquake, so safety can still be guaranteed, and there is only a 5-minute helicopter flight from the nearest military area, which minimizes the possibility of man-made invasion!
Security companies can prevent general-scale invasions, but what if other countries adopt large-scale invasions at all costs? This kind of thing may not happen, but preparations for sitting still need to be done. After all, this possibility is not great, but it is not without such a possibility.
(https://)
Please remember the domain name of this book's first publication:. Mobile version reading URL: