Vol 2 Chapter 658: The new space program node is ready!


Lei Tiantang can also understand their concerns, but they are in different positions and look at the problem from different perspectives. They are worried that too much limelight will cause some bad effects on the company, but in his view, the size of the company It has developed to the current stage of their company. It is impossible to keep a low-key low-key!
Rather than compromise with the defeated dogs, and no longer give them a few sticks, as long as they are completely scared, they will be honest, not to mention that now is the era of the people's wisdom, and the people are not. Like before, the media believes what they say. Now some media without a moral bottom line hacks their company and most of the people take such news as a joke.
"I know the boss, then I will let the'Gaia' base carry out the launch mission according to the plan, and the media will still report in accordance with the normal process!"
Kong Yu laughed when Lei Tiantang didn't care and didn't persuade him any more. To be honest, he didn't want to delay the company's development due to the pressure of public opinion. After all, this launch mission is too important for the company!
If the company’s previous launch of satellites and space telescopes was to lay the foundation for the company’s space program, then the next launch mission at the Gaia base is to lay the foundation. Although it is only a small step forward, this step is also the same. Very important!
"Well! Since the'Giantlings-1' is ready to be completed, of course it must be done according to the scheduled plan. Our space program can't be delayed at all!
Just leave the work of the media to the Propaganda Department, and you and the person in charge of each laboratory will be responsible for watching the progress of the task. There is no technical problem, right? Lei Tiantang nodded and asked after agreeing.
Asking specific technical questions, Kong Yuxiao certainly wouldn't answer it on his behalf, so he looked at Xiong Antai and Zhang Hanxiu, the laboratory directors, and motioned them to answer this question from the boss.
"We are very confident in the technology of the latest heavy-duty launch vehicle we designed! We have done 14 times in the recovery test alone, and none of them failed!
Moreover, we have achieved a 100% successful record through the simulation experiment of "Origin". We have done simulation tests under various design standard conditions, and the results of simulation tests have also been carried out during the actual flight test. Verification, all technical indicators have met the requirements!
Of course, there may be unexpected accidents at any time, so this time we assembled two "Giantlings-1" heavy recoverable rockets at the "Gaia" launch base to ensure that they can be used in case of an accident. Launch again in a short time to ensure that the mission time node is not delayed! "Xiong Antai was the first to answer briefly.
From Xiong Antai’s answer, we can see that the Infinite Gravity Group is rich in wealth. You must know that what he said was that the formal recoverable launch experiment was done 14 times, not the rocket experiment!
A brand-new rocket needs too much test work from the completion of the design to the formal delivery. The rocket test is a variety of tests conducted to verify the performance and quality of the rocket, including ground tests and flight tests.
Rocket design is highly dependent on experiments, and a large number of experiments are needed to provide the basis for the design. Modern rocket tests are developed on the basis of aircraft tests.
It inherits the segmented test procedures and methods of aircraft test, from parts, components, sub-systems to the whole system, from ground test to flight test; it also inherits aircraft test technology, such as wind tunnel test, strength test, environmental test, Land interview car and flight test technology.
Simply speaking, you can tell a lot of places that need to be tested, and even with so many complicated experiments to be done, the Rocket Lab can do so many formal recovery test experiments. Think about it. How much money will it cost?
Without sufficient funds to do these tests, how could Rocket Lab complete the task of developing heavy recoverable rockets assigned to them by Lei Tiantang in a little over a year!
"Yes, boss, our Deep Space Laboratory has also prepared two space station test chambers, and they have also completed the assembly and testing work at the Gaia base. If the first launch is not successful, we can Launch the backup space station experiment warehouse with the backup rocket in the shortest time!
Of course, we are still very confident in our technology. Although this launch is the first time we officially launch this newly developed'Giantlings-1' heavy recoverable rocket, our several laboratories have already joined forces. Tested many times together.
We will not let go of a little problem, until we have achieved the best data we can do at this stage, we finally decide on the launch plan~EbookFREE.me~ So the possibility of launching unexpectedly Very small!
Of course, our backup rockets and space station test chambers will not be wasted. If our first launch is successful, then after a period of in-orbit testing, there will be no problems, then we will also backup rockets and space station test chambers. Pull out the factory and launch it up.
In this way, we can once again verify the technical stability of the'Giantlingshen-1' heavy recoverable rocket, and also verify our space station docking technology, and back up the docking and disengagement of the space station experimental chamber and the first-launched experimental chamber In the experiment, we also have to do many tests.
I don’t say that everyone knows the importance of this technology. It will be related to whether our space station plan can be carried out smoothly according to our planned time node. Therefore, we have to conduct two experiments at different orbital altitudes and different angles. Testing the docking and disconnection of the warehouse is still very time-consuming, so we must do it as soon as possible!
Only when our two space station test chambers have completed all the technical verification work, can we start the formal space station manufacturing work. This time will take one year at the shortest time.
But it doesn’t matter much if there are any problems, because we have reserved half a year of response time for the scheduled plan, which means that as long as we complete all the testing within a year and a half, it will not be delayed at all. Our Earth Space Station program.
After all, we have only just finished the recruitment of astronauts, and the relevant training work of these new and tender astronauts will take at least this long to complete. There is no problem at all time points! "Zhang Hanxiu also reported confidently.
(https://)
Please remember the domain name of this book's first publication:. Mobile version reading URL:
Latest chapter of Ebook I Have a Little Black Hole Click here