Chapter 515: Environmental protection construction


"At present, the land clearing and leveling work has been completed. We are currently excavating the foundation of the dome and the foundation of the urban architectural planning part." In a conference room on the site, the engineer is introducing the construction progress of the project to Chen Xin.
The excavation of the building foundation is the top priority of the entire construction project, and in a sense, it is not too much to regard it as the most important part.
The foundation of "a tall building rises from the ground on the ground" is the foundation that determines whether the building is firm and durable.
If the foundation of a building is not well laid, then even if the building is built, it is still a paper house that can be pushed down.
This point does not need to be emphasized deliberately for Yan Guo, a major infrastructure country, and the Yan Guo engineering team can complete the construction in accordance with the requirements of the project without reminding.
"Well, I have seen this just now, and it seems that you are doing a good job." Chen Xin smiled on his face, as if he was very satisfied with the construction progress of the engineering team.
Hearing what Chen Xin said, the engineer immediately smiled. Although Chen Xin is not his superior, it is clear that Chen Xin's approval is still a happy thing in his opinion.
However, while complimenting him, Chen Xin also asked the engineer: "Did you excavate the foundation of the building first, and then construct other supporting facilities?"
This is what Chen Xin was curious about when he inspected the construction site just now. The workers were digging the foundation and digging very deep, but they were basically limited to the scope of the construction planned on the design drawings.
The part of the land outside this area has only been leveled, and no excavation has been carried out.
However, according to the design drawings, various supporting facilities will be built on the non-building part of the land, so Chen Xin has this question.
After all, this is an entire city, and it is impossible to just build houses, and supporting facilities such as sewers, drainage pipes, and heating pipelines will also be laid, not to mention city-level power supply lines and dome lighting systems.
In the future, in this dome city, lighting will be used to simulate light changes, so as to artificially create the difference between day and night.
"Yes, according to the construction plan, the progress of this phase is mainly to excavate the foundation of the building. As for the supporting facilities, according to the construction plan, construction will be carried out after the foundation is completed." The engineer explained to Chen Xin, although Chen Xin is not his boss, but Chen Xin's identity is undoubtedly more important than his boss, and any questions he has engineers need to answer for him.
After listening to the engineer's explanation, Chen Xin didn't have any special views or opinions. He didn't understand the construction of the project, and he only asked what he didn't understand.
However, after the engineer explained, Chen Xin nodded pretendingly, without asking more.
However, a designer on the side took the initiative to speak at this time and said to Chen Xin:
This is mainly due to the special situation of the dome city. According to our plan, the main construction of the heating energy tower and the dome will be completed first. Then raise the temperature under the dome to restore the temperature of the entire construction environment to above zero. This will greatly reduce the difficulty of construction and allow the original construction machinery to function."
Chen Xin can understand this. Most of the original construction machinery used diesel, and when the diesel reached tens of degrees below zero, even high-grade diesel could easily condense, causing the diesel engine to fail to start.
Not to mention that these construction machinery themselves are very rough designs, and the cab is not designed to be wind and cold. In this kind of weather, even if the driver has protective clothing, the joystick will freeze.
But if the dome insulation can raise the temperature of the construction site under the dome to above zero, these construction machinery that has been unusable can naturally come in handy.
After all, even with the help of Engineering Titan, digging on frozen soil and digging on ordinary soil are two completely different difficulties.
Therefore, when formulating the construction plan, someone proposed to complete the dome and energy tower first, so that electricity can be obtained through the energy tower to ensure the construction of the site, and the temperature of the entire construction site can be warmed up by the heat preservation of the dome and the frozen soil can be warmed up. Melt, reduce the difficulty of construction.
"This has been determined before, but I am not worried." Chen Xin nodded and talked about another thing: "The Dome City is an ecological city, and the ecological environment is the most important for this city. Yes, so I hope you can also pay attention to this issue during the construction process."
Since Chen Xin does not emphasize this issue, the design of the dome city emphasizes its important role in ecological reconstruction. Therefore, all parts of the entire city are built around the core of green ecology.
Not only are there all kinds of green plants in the city, the design of a series of supporting facilities including the city's water cycle, garbage disposal, etc. are all designed with the most environmentally friendly design, so that the city can create the most perfect ecological environment in the future .
The construction itself is the most ecological damage, even no matter how much attention is paid during the construction process, this will still affect more or less.
Chen Xin’s reminder also hopes to minimize its impact on the ecology during the construction process.
Even if there is no ecology on the construction site of the dome city, this is a problem that must be faced after the dome is built. If you do not prepare now, it will be a big problem if there is a problem in the future.
Regarding this problem, both engineers and designers have already kept it in mind, and they also paid attention to this point in the previous construction process.
Now Chen Xin mentioned it again, and both of them nodded and said: "Please rest assured, the academician, we will not be sloppy about ecological issues."
While guaranteeing Chen Xin, the engineers also emphatically introduced their efforts during the construction process: "We strictly follow the construction requirements during the construction process, and protect the environment and ecology from the beginning. Implemented on everyone's head.
All workers have received relevant education and related responsibilities have been clearly defined. We will make every effort to ensure that the entire construction is foolproof.
Regarding the impact on the ecological environment during the construction process, the recoverable part will be restored after the completion of the construction, and the unrecoverable part will be minimized as much as possible to ensure that the ecological and environmental impact during the construction process is reduced. To the lowest. "
"I'm relieved to hear you say this." Chen Xin's smile even worsened when he heard the engineer say this.
Now that it has been decided that he will live here in the future, Chen Xin certainly hopes that his new home will have a better environment in the future.
Latest chapter of Ebook Doomsday Bunker Upgrade Click here